To be compliant, every worker visiting a defence base must complete a site induction for each location they will be attending. Workers can use the following link to complete their site inductions. Multiple sites can be completed at once.
Ventia uses SAP Ariba for all sourcing and purchasing activities, as it streamlines and simplifies the process for our suppliers and subcontractors. Ariba is also the world’s largest Business to Business (B2B) network and is used widely across public and private sectors in Australia and New Zealand.
Please use the following link to access Ventia’s support page for Ariba. If you have further issues or queries, please contact the DBS team.
UI5 is an application that can be accessed online from a laptop, mobile phone or tablet which enables a subcontractor to immediately receive, easily update work orders, or submit a claim without having to return to the office or contact Ventia by phone or email. All updates to a work order are uploaded in real-time to the Ventia core system, therefore providing live updates from the field.
This section of the portal provides guides and support materials for subcontractors servicing the DBS contract.
UI5 may also be referred to as the Mobility Application or the Subcontractor Portal.
Please use the following link to access Ventia’s support page for Ui5. If you have further issues or queries, please contact the DBS team.
Rapid Global Workforce Management is the system Ventia employs to manage the lifecycle of our subcontractors and suppliers for Safety, Health, Environment and Quality (SHEQ) and compliance.
All contractors engaged by Ventia must register their company in Rapid Global, upload the mandatory documents, including insurance certificates and contractor licenses to the company profile, and are responsible for ensuring all documentation is kept up to date.
Rapid compliance is monitored for every subcontractor and is a measure considered during contractor meetings.
To see the complete Rapid Global Guide, relevant to works on the DBS contract, please use the following link.
Rapid Global technical support:
Call: AUS: 1800 307 595 – 8.30am-6pm, Mon-Fri (AEST). For callers outside of Australia phone: + 61 8 8405 1100
Email: support@rapidglobal.com
Rapid GO is Ventia’s Site Sign-in/Sign-out program. Rapid GO is a new initiative to ensure greater compliance, reporting, and risk control, along with many other benefits.
How The System Works
The system works by ensuring that anyone who intends to enter a Defence base for Ventia works, signs in & signs out using a QR code which will be available at a Ventia site office.
Personnel who enter a Defence base and scan the QR code need to be registered and compliant in Rapid Global and have successfully completed their General & Security MAAT training. Failure to be fully compliant, will result in a notification being sent to a Ventia representative, with the non-compliant personnel being asked to leave the base until 100% compliance is achieved.
Benefits
There are several benefits of the new site sign-in/sign-out procedure and online induction process. Some of the benefits include the following;
- Mobile sign-in/sign-out solution using a QR code
- Ventia can see who’s on site in real time, resulting in greater awareness of who has entered a Defence base for Ventia work
- Sign-in data is available in Rapid Global in real time
- In built email/SMS notifications for emergency purposes and location of personnel
- Real time and historical data reporting
- Greater risk control
- Improved governance to create safer work sites
- Streamlined induction process
- Consistent information sharing
Most importantly, the system provides greater safety by ensuring we are only permitting compliant contractors and inducted personnel who are fully compliant to work at our sites. This in turn creates a safer work environment for all employees and contractors.
Below is a link to the Rapid Go datasheet and a video for reference.
Please note: Rapid GO is a new initiative that is currently active in select states with rollout in all states to occur in the remainder of 2024. Please ensure all your management, operational staff, secondary subcontractors and any other party which provides a service to Ventia Defence site are made aware of these instructions to maintain compliance.
For More Information & Support
Support will be provided for company administrators by the Rapid Global Client Services Team by calling 1800 307 595, Mon – Fri, 8.30am - 6:00pm (AEST) or via email: support@rapidglobal.com.
Additionally, you can also contact your Regional Subcontractor Lead.
Subcontractor KPIs
If outlined in their service agreement, subcontractors must upload their ‘Monthly KPI Score Card’ Spreadsheet to communicate their performance to the Subcontractor Management Team. Subcontractors are required to report on health, safety, environment, compliance and can include information about activities in their social and local communities.
Required metrics can be seen in the attached template below. This template is to be used in the first instance, and added to each month with the relevant data.
It is expected that Subcontractors of Ventia always adhere to a high standard of operation. There are many requirements that subcontractors must comply with to meet the essential requirements.
Subcontractors must:
- Perform the services in accordance, and otherwise comply, with the Ventia Service Order, this Law, Approvals and Good Industry Practice
- Subject to receiving a Service Order, commence performing the services from the date specified on the Service Order, and complete the services: Diligently and regularly, Within the times required by the relevant Ventia Service Order; and Comply with all directions given by Ventia in accordance with, or to comply with the relevant Ventia Service Order, Ventia Policies, Ventia Procedures and Ventia Plans
- Meet or exceed KPIs
- Ensure that all materials, equipment and goods used in the performance of the services are new, of good quality and free of defects
- Regularly and diligently carry out its obligation under the relevant Ventia Service Order and Subcontract agreement
- Keep Ventia fully and regularly informed as to all matter affecting or relating to services
- Prepare Subcontractor Management Plan or comply with the Subcontractor Management Plan outlined by Ventia
- Coordinate the services with any activities being undertaken by Ventia, other subcontractors or the client on or around the site, and not delay or disrupt the activities performed by Ventia, other subcontractors or the client
- Adhere to mandatory insurance requirements
- Ensure that the subcontractor’s inductees hold the necessary qualifications, skills and experience to competently perform the roles in which they are engaged
- Ensure all team members complete the Mandatory Annual Awareness Training (MAAT) General and Security modules via Rapid Global.
- Ensure all team members complete the relevant site induction modules via Rapid Global.
- Perform all works safely, and in a manner that does not put the health and safety of any person at risk, in a matter that protects, and does not cause damage to property, and in a matter which enables Ventia to satisfy its obligations under the OH&S Law and ensure that it does not do anything, or fail to do anything, that would cause Ventia to be in breach of the OH&S Law
An unsatisfactory performance is to be clearly identified and communicated to the Contractor before commencement, as well as being clearly outlined in the contractual documentation submitted. An unsatisfactory performance may be described as:
- Violation of the safety policies
- Unsafe work practices
- Inadequate, incomplete, or poor-quality work
- Questionable business practices
- Poor compliance to subcontract requirements
Any matters of performance can be raised in regular or additionally requested meetings with the relevant Regional Subcontractor Lead.
For all things Health, Safety, Environment and Quality, please visit Ventia’s Connect Site. If you require further SHEQ assistance or queries, please contact your Subcontractor Lead or SHEQ Advisor.
This site includes all general information such as:
- Our policies and procedures
- Critical Risk Protocols
- Current Campaigns
- Archive of Alerts
To view SHEQ permit forms, processes, plans, guides, instructions, and other resources, please visit:
Traffic Guidance Scheme (TGS) is to describe the sites approach to managing traffic hazards. In particular, the elimination or reduction of interaction between mobile plant, vehicles, and personnel. As driving and vehicle incidents compile a large percentage of events reported on site, it is important that subcontractors are aware and compliant with safety requirements when driving on site, managing traffic within a worksite, correct signage, parking, etc.
Objective Quality Evidence (OQE) provides verifiable evidence that a task has been completed as intended and in accordance with the maintenance schedule and standards. All tasks performed in Estate Upkeep must demonstrate that the performance meets Defence requirements and Industry Standards.
Subcontractors are able to use their own procedures and checksheets when performing a maintenance task/activity provided that the intent of the requirements set out by Ventia (See attached Work Instruction) are met and that the checksheets have been approved for use by the Site Infrastructure and Support Manager (ISM), Regional SHEQ Advisor and Subcontractor Lead.
Examples of OQE documents includes but are not limited to:
- Maintenance Checklist
- Jobstart
- SWMS
- Engineering Report
- Equipment Notification Form
- Other documents mandated by AS/ISO/DOD
For further information regarding how to upload, the correct format, bulk uploads and troubleshooting, please see the below Work Instruction.
As a DCAC Holder, when you leave the country, please ensure you action the following:
- Read the Overseas Travel Brief
- Visit the DFAT Travel Website (Travel | Australian Government Department of Foreign Affairs and Trade) and the Smart Traveller Website (https://www.smartraveller.gov.au) for any warnings for the country/s you are visiting including Coronavirus (COVID-19) updates.
- Ensure you do not take your DCAC (access card) with you overseas.
- In a crisis you can call the 24 hour Consula Emergency Center to +61 2 6261 3305 (from overseas) or 1300 555 135 (within Australia)
- Report any suspicious activity to security team on return.
- Complete and return section 4 of the AB644 Overseas Travel Briefing and Debriefing and return all 5 pages in one document to DBSSecurity@ventia.com when you return to work after travelling.
Project Support is a term used within the DSO Operating Model and Base Services Contract to describe a holistic approach to the Development, Delivery and Acceptance into service of projects that impact the estate, physically through changes to the estate to changes to the services provided through the suite of Base Services contracts. Project Support activities apply to the overall lifecycle of the project.
Project Support Services assist in the development and delivery of projects through the provision of advice, support and information management to key project stakeholders.
The key tasks of the Project Support Services are:
- Manage the project lifecycle
- Provide information
- Review documentation and progress
- Advise
- Facilitate transition
- Report activities
To contact the Project Support Services team, please use the following emails:
Northern Territory: pssnt@ventia.com
South Australia: psssa@ventia.com
Victoria and Tasmania: pssvt@ventia.com
Western Australia: psswa@ventia.com
The Project Lifecycle provides structure for all stakeholders involved in a project, outlines expectations and ensures milestones are achieved.
1. Scoping and Feasibility
Subject matter experts, stakeholders and end users collaborate to identify needs/particulars of the project, discuss scope, desired outcomes and project objectives. It is expected that at the scope start up meeting the discussion is targeted to the planning of the project, the intended outcome, scope and deliverables, technical and physical requirements, define success measures, and data considerations. This process aims to ensure that contractors tendering for the project works are aware of all required deliverables and can provide a tender evaluation accordingly.
2. Design and Tendering
In this phase, the project moves through different stages of design, with reviews from stakeholders to finalise scope lockdown, stakeholder expectations and project deliverables. The HOTO checklist will be discussed between stakeholders during this stage. When the HOTO is delivered as part of the tender documentation contractors will be aware of all of the contractual deliverables and can tender accordingly.
3. Construction
At this stage, the project has gone to tender, and the contract has been awarded by the Project Support Services to their preferred contractor. A construction start up meeting will be set by the PSS and include all relevant stakeholders. The aim of this meeting it to discuss particulars of the project, such as:
- Site access and contractor inductions, site access times
- Disruption to Defence operations due to construction works
- Project start and finish projections
- Other project specifics to clarify any queries stakeholders may have (e.g., where contractor will access water for water truck, etc.)
- Operation and Maintenance Manual Submission
- Defects Liability Period dates
- Project meeting times
- Drawing Submission dates
During the construction phase, project progress meetings must be held on a regular basis. These will vary in frequency and may include:
- Project milestones and key delivery dates
- Track progression of key delivery dates
- Construction issues to be addressed
- End user or contractor variations
- Clarification between stakeholders on items such as fixtures/furnishing/finishing’s etc
- Any defects and rectification of such
4. Handover/Takeover
This phase comprises of stakeholder review and sign-off of project deliverables. The PSS will coordinate a Final Project progress meeting to discuss any outstanding requirements of the project. It is a requirement that all caveats/conditions to acceptance of delivered works are logged and must include a person responsible for completion of remaining works and defects and estimated time for completion. This is done to ensure that:
- Reasonable timeframes for completions/rectifications are agreed upon by stakeholders
- Any issues/defects can be acted upon by responsible person
- Progression can be monitored by stakeholders
The project then enters the Defects Liability Period.
Alternative Proposals applies to the Estate Upkeep service line only and where reactive breakdown is over $10,000.
If works are confirmed after site visit to be in excess of $9,100 and an AP process is required, the BSSC is informed and the original job is moved to COMP status. A new AP Service Order is raised.
Survey and Quote (S&Q)
S&Qs are only used in very specific circumstances, as follows:
- Engineering and other consultancy services required in order to support development of an AP
- Repair of those whitegoods not identified through the contractual EU asset lists
- Electrical Integrity testing
- Other, one-off requirements as directed by DEPU
The HOTO process includes a HOTO Plan & Checklist, Data Provision Checklist, a Responsible, Accountable, Consulted, Informed (RACI) matrix and a workflow diagram. The HOTO Plan & Checklist are to be used for all estate projects to demonstrate that HOTO requirements have been considered, the required evidence is compiled, stored and available for assurance by project stakeholders. The purpose of the HOTO policy is to ensure that all estate related projects adhere to a systematic process to demonstrate that the project management practices, actions and deliverables comply with legislation, Australian Standards and Defence policy and instructions to deliver safe, compliant and fit for purpose facilities.
The HOTO process is a progressive assurance activity that commences in the project development phase and concludes at the end of the defects liability period (DLP). To achieve the benefits of an effective HOTO, the process requires continual stakeholder engagement and information delivered throughout the project lifecycle at the right time to inform project delivery and sustainment. By following an agreed HOTO protocol, clarifying responsibilities and promoting collaboration between all project stakeholders, the following benefits will be gained:
- project stakeholders have greater alignment and clarity about project quality, compliance and delivery requirements
- project issues are identified early, risks reduced, and issues can be resolved earlier in the project lifecycle
- minimise project cost variations caused by differing stakeholder expectations and understanding on project quality, compliance and delivery outcomes
- reduce the number of delayed handovers and subsequent period on nonoccupation
- improve the effectiveness of ongoing in-service management and maintenance support, while reducing ‘whole of life’ sustainment costs for project deliverables.
Contractor Responsibilities
The Contractor (can be the Head Contractor, Head Contractor (Medium Works), Managing Contractor and/or Design Services Contractor) is responsible for conducting all Contractor HOTO obligations within any applicable timeframe prescribed by, or determined in accordance with the HOTO requirements. This includes initiating and ongoing management of the HOTO Plan & Checklist and works are satisfactorily completed, safe, fit for purpose and Defence specified estate information requirements are met.
It is the responsibility of the subcontractor to ensure they adhere to the defence standards of HOTO. It is encouraged that you reach out for assistance if you have any questions or queries.
Contact List:
Northern Territory: pssnt@ventia.com
South Australia: psssa@ventia.com
Victoria and Tasmania: pssvt@ventia.com
Western Australia: psswa@ventia.com
Helpful Links:
To view the HOTO Policy for Defence Estate Projects Policy click here
To view templates and GDL guidelines click here
To view Estate Project Support Services click here
To view relevant industry regulations and manuals click here
The Defects Liability Period (DLP) is a set period of time after a project has been completed during which a contractor has to return to the site to remedy defects. A typical defects liability period lasts for 12 months. The Warranty Period covers the period the manufacturers’ guarantees are valid which can be two to five years.
As part of the close out of a project on the Defence Estate, the following information must be provided by the contractor to Project Support Services (PSS) to ensure that Ventia can identify any maintainable assets or plant:
- The GEMS Data Load (GDL) Tool
- The DLP Flowchart – Part of the O&M Manual
Four weeks prior to the DLP end date, the PSS representative may arrange an end of DLP meeting to date place. The stakeholders will attend site to conduct a walkthrough, in order to identify any defects or outstanding project deliverables. At the end of the DLP period, the assets will be added to the maintenance schedule as per the Base Services Contract.